Āyuṣyaby AnahataSri · ASA = AnahataSri Ayushya PV
Early access · sample data

The product

One place to see how a module’s bill of materials will age in a given climate, why, and what it means for energy and money. Three linked screens take you from the portfolio to a single failure mode. The L2 risk card exists in our current build; L1 and L3 are roadmap designs shown with sample data.

L1 · Command centre

Roadmap design. Portfolio view: star rating, performance loss rate, cost priority, open high-risk items, a tile map of plants and a ranking of bills of materials by risk.

Command centre screen with portfolio KPIs, a tile map of sample plants across India, a BOM risk leaderboard, alerts and recent uploads
SAMPLE DATA · ROADMAP DESIGNL1 Command centre, roadmap design. All plants, BOMs and reports shown are sample records. Tap to open full size.

L2 · BOM risk card

Pick a cell technology, encapsulant, rear side and an Indian climate zone, and read how much power the module is expected to keep after 25 years, with typical (P50), cautious (P90) and optimistic (P10) cases and what wears it down. This screen is from our current build.

BOM risk card from the current build: choose cell, encapsulant, rear side and climate to see power retained after 25 years with P10, P50 and P90 lines and the share of each stress
SAMPLE DATA · DEMO PRIORSL2 BOM risk card, current build (not yet open to the public). Tap to open full size.

Where the risk card is going

The roadmap design adds an exploded module cross-section, predicted power loss after each stress test, a performance, safety and reliability score, top failure modes and the retests a BOM change triggers.

Roadmap design of the full BOM risk card for a sample TOPCon glass-glass module: cross-section, predicted power loss chart, BOM editor, performance-safety-reliability diagram, failure modes and retest matrix
SAMPLE DATA · ROADMAP DESIGNL2 roadmap design, full screen. Tap to open full size.
Predicted power loss after five stress tests for a sample module bill of materials, with P50 and P90 bars and 2% and 5% reference lines
SAMPLE DATA · ROADMAP DESIGNL2 roadmap design: predicted power loss after stress. Tap to open full size.

L3 · Failure-mode workspace

Roadmap design. One mechanism in depth: mechanism tree, weighted evidence, dose-response fit with uncertainty band, sensitivity ranking and a recommendation with its trade-off.

Failure-mode workspace for UV-induced degradation: mechanism tree, evidence list, dose-response chart, sensitivity ranking and recommendation
SAMPLE DATA · ROADMAP DESIGNL3 Failure-mode workspace for UV-induced degradation, roadmap design. Tap to open full size.

Who it is for

Developers

Compare module choices by long-term risk, not only price.

Investors and bankers

A risk view with stated uncertainty and an explicit year-25 basis.

Manufacturers

See which material in the BOM drives the risk and which retests a change needs.

Labs and academics

Link test results to mechanisms and cite the sources.

The prototype is not open to the public yet. To try it with your own module data when it is ready, join early access.